A mesh is put on the studs and the insulation is blown into the cavity in upgraded "green" product.
The yellow fiberglass batt insulation is for sound.
Paper and wire for stucco is commonly called "lath"
Revised Framing on Fireplace and Entry Nicho
View of Fireplace and Balcony
View from Kitchen Toward Dining Room and Patio Door
Finished Framing
Framing Under Construction
View From Upstairs Deck
You May be Able to See the 2nd Concrete Truck Pouring the Front Part of the Slab While the Back is Being Pumped with the Boom Pump Truck
Slab is Formed and Steel is in Place
Trenches Dug and Plumbing Going in the Ground
This is before starting